Publication

2 abonnés S’abonner
0
Avatar

Active Link

After the map has been prepared how long does the public link stay active ?

Bruce Hope

Commentaire officiel

Avatar

The public link stays active for as long as it is being actively used. If more than 6 months goes by without the map being viewed the files are at risk of deletion. 

Zane
Actions pour les commentaires Permalien

Vous devez vous connecter pour laisser un commentaire.

1 commentaire