Sorry for the delay. Your job is up and running. Since it was not marked as an "ASAP" urgency job it was preempted by higher priority jobs. It was due to start by about 15 minutes ago which it was. The ETA is an estimated time of arrival based on the initial kickoff time. The estimation of the job duration is based on historical values and can be significantly longer when the survey area is complex or when lots of overlap is used.
Post
FolgenPending, ETA, Past due.....
Hi Folks. My (uploaded) Project......"Pending", ETA passed 19 hours ago.....still "Pending".
Marty
Bitte melden Sie sich an, um einen Kommentar zu hinterlassen.
4 Kommentare
Sorry for the delay. Your job is up and running. Since it was not marked as an "ASAP" urgency job it was preempted by higher priority jobs. It was due to start by about 15 minutes ago which it was. The ETA is an estimated time of arrival based on the initial kickoff time. The estimation of the job duration is based on historical values and can be significantly longer when the survey area is complex or when lots of overlap is used.
Great! Thanks for the quick response, Zane! BTW, I did have some trouble with "uploading" this mission......"Maximum Waypoints in use" pop-up with several attempts, but when I tried again after selecting "Connectionless", it uploaded. Wouldn't have thought the two were related, but I had to try something.....while in the field......not having seen this before

Can you please ask that in a separate question for searchability sake.